Line 3: | Line 3: | ||
''All KNI users must follow the guidelines listed below, including the updated general SOPs for entry and exit and Labrunr tool reservations. In order to protect the safety of all KNI lab users and staff, repeated violations to these policies will result in revocation of lab access.''<br /> | ''All KNI users must follow the guidelines listed below, including the updated general SOPs for entry and exit and Labrunr tool reservations. In order to protect the safety of all KNI lab users and staff, repeated violations to these policies will result in revocation of lab access.''<br /> | ||
{| class="wikitable" style="width: 60%;" | {| class="wikitable" style="width: 60%;" | ||
|'''Current Phase: | |'''Current Phase: 5'''<br /> | ||
* Effective Wednesday, May 26, 2021, at 8:00 am, lab members will be able to use the KNI 24 hours per day, 7 days per week with increased density per the documents found below. | * Effective Wednesday, May 26, 2021, at 8:00 am, lab members will be able to use the KNI 24 hours per day, 7 days per week with increased density per the documents found below. | ||
'''Mandatory protocols for the phased re-opening of the KNI Lab:''' | '''Mandatory protocols for the phased re-opening of the KNI Lab:''' | ||
Line 13: | Line 13: | ||
---> | ---> | ||
*The KNI Lab’s safety, hygiene, density, and physical distancing requirements: | *The KNI Lab’s safety, hygiene, density, and physical distancing requirements: | ||
** [https://caltech.box.com/s/sdvcle9ukhm7iqx6sjk8zyegx59utf9x KNI Buddy System SOP] | ** [https://caltech.box.com/s/jah0ieu5rwv73hfa2n06604195z7daqu KNI Buddy System SOP - Phase 4 & 5] | ||
** [https://caltech.box.com/s/hjf1h88lzrjpfo83ytvf3yt08lh51lx3 KNI Cleanroom Sanitation and Wipedown SOP] | ** [https://caltech.box.com/s/sdvcle9ukhm7iqx6sjk8zyegx59utf9x KNI Buddy System SOP - Phase 1,2 & 3]<br /><br /> | ||
** [https://caltech.box.com/s/ | ** [https://caltech.box.com/s/hjf1h88lzrjpfo83ytvf3yt08lh51lx3 KNI Cleanroom Sanitation and Wipedown SOP - Phase 1,2,3 & 4]<br /><br /> | ||
** [https://caltech.box.com/s/ | ** KNI Lab Entrance/Exit Room B207 - Phase 5: Four people are allowed to use the entrance gowning room at the same time: Social distancing is in effect in the "No Standing Zone". | ||
** | *** [https://caltech.box.com/s/vj8483gvl4051gbivhojtuqbq2mljp1x KNI Lab Entrance/Exit Room B207 Map - Phase 5] | ||
** | ** KNI Lab Entrance/Exit Room B207 - Phase 4: Two people are allowed to use the entrance gowning room at the same time - Only one person allowed inside the "No Standing Zone" and the "Changing Zones" at any time. | ||
** Maximum | *** [https://caltech.box.com/s/vj8483gvl4051gbivhojtuqbq2mljp1f KNI Lab Entrance/Exit Room B207 Map - Phase 4] | ||
** Phase 1,2 & 3 - Only one person is allowed to use the entrance gowning room at any time. | |||
*** [https://caltech.box.com/s/vj8483gvl4051gbivhojtuqbq2mljp1x KNI Lab Entrance/Exit Room B207 Map - Phase 1,2 & 3]<br /><br /> | |||
** KNI Lab Occupancy Limit - Phase 5: Maximum 41 people allowed in the lab at any given time. No Room Occupancy Restrictions. | |||
*** [https://caltech.box.com/s/ja6mqzjsnhvmjw4wwrszqsltrmrevghh KNI Lab Room Occ. Limit Map - Phase 5] | |||
** KNI Lab Occupancy Limit - Phase 4: Maximum 37 people allowed in the lab at any given time with Room Area Occupancy Limit Restrictions. | |||
*** [https://caltech.box.com/s/ja6mqzjsnhvmjw4wwrszqsltrmrevghh KNI Lab Room Occ. Limit Map - Phase 4 allows 1 person per 150 ft^2 - ] | |||
*** [https://caltech.box.com/s/ja6mqzjsnhvmjw4wwrszqsltrmrevghh KNI Lab Room Occ. Limit Map - Phase 4 allows 1 person per 150 ft^2 - ] | |||
** KNI Lab Occupancy Limit - Phase 1,2 & 3: Maximum 21 people allowed in the lab at any given time | |||
*Training for both returning and new lab members will continue with the hybrid remote and limited in-person equipment and new user/general safety training plans that began during earlier phases. | *Training for both returning and new lab members will continue with the hybrid remote and limited in-person equipment and new user/general safety training plans that began during earlier phases. | ||
*The KNI technical staff members will operate on four days per week in-lab schedule (starting June 1, 2021), unless there are schedule conflicts. Staff will either be working in their offices or telecommuting on the days they do not report to the lab. Some delay in response to equipment requests is to be expected. | *The KNI technical staff members will operate on four days per week in-lab schedule (starting June 1, 2021), unless there are schedule conflicts. Staff will either be working in their offices or telecommuting on the days they do not report to the lab. Some delay in response to equipment requests is to be expected. | ||
*Steele building elevator occupancy: | |||
** Phase 5 - Max 7000 pounds weight limit, 46 persons Max. | |||
** Phase 4 - Only two people are allowed to use the elevator at a time. | |||
** Phase 3 - Only one person allowed to use the elevator at a time. | |||
** Phase 1 & 2 - Restricted use of elevator: Use South Stairwell. (One person allowed to use the elevator when transporting items only) | |||
|} | |} | ||
Revision as of 01:05, 24 June 2021
KNI Lab Rules and Safety Documents
KNI Lab Rules
All KNI users must follow the guidelines listed below, including the updated general SOPs for entry and exit and Labrunr tool reservations. In order to protect the safety of all KNI lab users and staff, repeated violations to these policies will result in revocation of lab access.
Current Phase: 5
Mandatory protocols for the phased re-opening of the KNI Lab:
|
KNI Lab General SOPs
- KNI Lab Entry and Exit SOP
- KNI Lab Entry Video
- KNI Lab Exit Video
- KNI Phase 3 - Labrunr Tool Schedule Coordination SOP
- KNI Phase 2 - Labrunr Tool Schedule Coordination SOP
- KNI Phase 1 - Labrunr Tool Schedule Coordination SOP
- KNI Labrunr Interlock box SOP and troubleshooting
KNI Lab Safety Documents
- KNI Emergency Procedures PDF - Provides an overview of Emergency Procedures specific to the KNI cleanroom.
- KNI Workplace Specific Safety Training persentation - Provides an overview of Safety Procedures specific to the KNI cleanroom.
- KNI User Handbook and Operation Procedures - Provides a broad overview of the information needed specific to the KNI Cleanroom.
- KNI Safety Manual - Provides a broad overview of information for Referenced Documents, Safety Requirements, and Chemical Safety Infromation.
- KNI Safety Data Sheets (SDS) - a link to the chemicals approved for use in the KNI Cleanroom.
KNI Safety Presentations
Caltech Safety Documents
- Caltech Chemical Hygiene Plan - Provides a broad overview of the information needed for safely working with hazardous chemicals in the laboratory.
- Caltech Hazardous Waste Management Guide - Provides a broad overview of information on Hazardous Waste determination, handling and disposal requirements, etc.
- Caltech Personal Protective Equipment - Appropriate Personal Protective Equipment (PPE) must match the task hazards and equipment is prescribed when hazards cannot be eliminated by administrative or engineering controls.